top of page

Robinson Pool

deckpro pumps were commissioned to replace outdated pumps and upgrade pipework with pre-fabricated, custom-made components at Robinson Pools (a public pool) located in Bedfordshire. We achieved an impressive 82% reduction in energy consumption while ensuring seamless pool operations around the clock.

Robinson Pools - Before.png
The existing installation of three 40-year-old Worthington Simpson pumps, using inefficient 9.3kW motors and installed with non-DIN standard cast-iron pipework, were leaking excessively. The build-up of scale on the inside of the pipework added to the inefficiency, as well as creating water quality problems. The pool was in use for 16 hours a day, 7 days a week, and we were asked if the pool could stay fully operational through any works.
Both the pumps and the pipework needed replacing. Having identified the specific issues and challenges, deckpro pumps specified inverter-driven Modus pumps connected to a bespokemade control panel, to adjust the speed of the pumps automatically when the demand reduced (for example, when there were no swimmers in the pool). The new pipework was pre-fabricated, brought to site ready-toinstall and craned into place, ensuring that the pumps and pipework could be replaced in one night so that the pool could remain fully operational during normal opening times.
Robinson Pools_edited.jpg
IMG-20120905-00324.jpg
The result is a highly-efficient, low-maintenance pumping operation. The pumps use a combined total of about 82% less energy than the before, the quality of the pool water is improved, and this has been achieved with no inconvenience to customers or staff.

Subscribe to our newsletter

What Our Clients Say

“deckpro have been a valuable addition to our preferred contractors list, surveys are carried out very quickly and works completed to a high standard, excellent service. We highly recommend deckpro” 

View more case studies

Case Study Images (600 x 1000 px) (7).png

Case Study

Maldon Splash Park

Eliminating the risk of failure: we installed a secondary pump to improve the resilience of the filtration system at this park. 

Case Study Images (600 x 1000 px) (4).png

Case Study

Holiday Inn, Brighton

Upgrading systems with minimal disruption: we installed a new cold water storage tank without any downtime disruption.

Spa

Case Study

Bicester Hotel & Golf Spa

Submersible pump station service: take a quick tour of the key processes involved in a standard service.

Get in touch

Ready to see how we can solve your pump challenges? Get in touch with us and talk to one of our specialists.

bottom of page