RPM Installations called us in to upgrade the chilled water and heating pumps at Three Quays, a five-star mixed-use development operated by the prestigious Cheval Collection. Working alongside YSM Pipework Solutions and Mammoth Insulation Services, deckpro replaced four critical pumps and coordinated the installation of all associated components across both systems, delivering seamless integration and reliable, energy-efficient performance for residents and guests alike.

Three Quays Case Study Image (3).png
The Three Quays is a luxury mixed-use development on London’s Lower Thames Street, comprising residential apartments, hotel suites and shared spaces. The building’s central plant systems were operating with ageing equipment, including large chiller pumps serving the rooftop cooling system and outdated heating pumps in the basement boiler room. In addition, the condensate pump setup required new inverters and control upgrades. Given the scale of the work, and the nature of the site, effective coordination and communication was essential to minimise disruption and ensure delivery within normal working hours.

Over three carefully scheduled days, our team removed and replaced:

  • Two large Grundfos chiller pumps (including associated pipework and spools)

  • Two smaller Grundfos heating pumps (LTHW and HWR)

  • Two new Grundfos inverters and four transducer kits for the condensate system

All works included insulation, pipework modifications, commissioning and tidy removal of waste from site. 

Three Quays Case Study Image (1).png
Three Quays Case Study Image (2).png
The new systems bring improved energy efficiency, better pressure control, and enhanced reliability across both heating and cooling services — with minimal disruption to the building’s 24/7 operations. Our client was pleased with the results and has since invited us to review additional pump systems on site.

Subscribe to our newsletter

Operations Manager, RPM Installations: 

"deckpro carried out these works in an efficient and professional manner, this is something that we have grown to expect when working with deckpro."

View more case studies

IMG_9635.JPEG

Case Study

Thistle Hotel, Marble Arch

Our pump replaced a failing unit at the hotel, safeguarding RPM Installations' operations without disruption.

Holiday Inn Brighton (cold water tank) (4).jpg

Case Study

Holiday Inn, Brighton

Upgrading systems with minimal disruption: we installed a new cold water storage tank without any downtime disruption.

Hospital Employees

Case Study

London Hospital

Critical heating upgrade: Installed a new dual pump for an aging system serving a London hospital's maternity ward and main block.